Location Italy
Scope Of Work Test of an automatically operated SediCon Dredge and supply of SediCon Sluicer.
Schedule 2021-2022
Project Detail
Arlia is a 3.75 MW power plant, commissioned in 1913. The annual sediment inlet flowrate is 4000-5000m3/year
A 150 mm SediCon Dredge and a 225 mm SediCon Sluicer were supplied to test SediCon’s innovative solutions with automatic operation.
Implementation: The SediCon equipment was installed, tested, and commissioned in 2021-2022.
Results: The estimated capacity is 20m3 sediments per hour for the Dredge and the Sluicer have a theoretical capacity of 80m3 sediments per hour.