Arlia

Location Italy
Scope Of Work Test of an automatically operated SediCon Dredge and supply of SediCon Sluicer.
Schedule 2021-2022

Project Detail

 

Arlia is a 3.75 MW power plant, commissioned in 1913. The annual sediment inlet flowrate is 4000-5000m3/year

A 150 mm SediCon Dredge and a 225 mm SediCon Sluicer were supplied to test SediCon’s innovative solutions with automatic operation.

Implementation: The SediCon equipment was installed, tested, and commissioned in 2021-2022.

Results: The estimated capacity is 20m3 sediments per hour for the Dredge and the Sluicer have a theoretical capacity of 80m3 sediments per hour.

 